>
A 32 page operational playbook for deploying the IBM License Metric Tool in production. Architecture, scanner agents, the bundle file lifecycle, quarterly Audit Snapshot reporting, and the governance model that keeps sub capacity coverage defensible under audit.
Corporate email required. We use the address to verify the request and to send the related papers in the series.
The contractual basis for ILMT under the Sub Capacity Licensing Terms and the audit consequences of a coverage gap.
The Db2 backend, the WebSphere runtime, the BigFix infrastructure, and the scanner agents on each in scope endpoint.
Estate inventory, server count thresholds, backend sizing, and the network bandwidth planning.
The phased rollout, the exception handling, and the products that require separate discovery scans.
Quarterly download, validation, deployment, and the audit defensible documentation trail.
Generation cadence, retention requirements, reconciliation against entitlement, and the controlled archive.
The IBM License Service running on OpenShift, the boundary with ILMT, and the VPC metric basis.
Ownership, cadence, escalation, and the documentary trail that survives audit scrutiny.
ILMT is the operational backbone of the entire sub capacity programme. The work on this page connects directly to sub capacity, ILMT, PVU optimization, and Passport Advantage. For container workloads the work shifts to Cloud Paks and Red Hat. For audit defence, see audit defense.
The 40 page enterprise guide to IBM sub capacity licensing and the ILMT obligation.
Read the guideReduce PVU exposure through architecture and workload placement.
Read the guide